Now serving Deerfield Beach, FL & surrounding areas

Not your area? Change
4.8 · 730+ Google reviews BBB A+ since 2001 FL Lic. CFC1428661

For Boards, Property Managers & Commercial Owners

Aging Drain Stacks? Here’s How Buildings Fix Them Without Opening 40 Walls.

Original cast iron stacks and risers are reaching the end of their service life across South Florida’s older buildings. Kyle Plumbing delivers trenchless restoration — Picote epoxy coating, descaling, targeted repair, and replacement where it’s needed — for occupied units and operating businesses, documented in writing for boards, property managers, and owners.

  • Trenchless stack restoration — units stay occupied
  • Picote epoxy coating · certified installers · one accountable contractor
  • Camera inspection, written findings, and a recommendation your board can act on

Open 7 days · 8:00am–10:00pm ·

Free Building Assessment

Free building assessment + a sample board report

We camera representative stacks and deliver a board report: the camera inspection, written findings, and a recommendation — with phasing options and budget ranges your board can plan around. Already had lining installed? Our existing-lining inspection — camera plus written findings with a recommendation, $650 — shows you what is actually in the pipe. Request the assessment and download a sample report to see exactly what you’ll receive.

Request the Free Building Assessment

By providing your phone number, you consent to receive calls and text messages, including automated ones, from Kyle Plumbing II, Inc. at the number provided. Consent is not a condition of purchase. Message frequency varies. Message and data rates may apply. Reply STOP to opt out, HELP for help, or START to opt back in. See our Privacy Policy and Terms & Conditions.

How Building Projects Price

Multi-unit restoration projects are scoped, phased, and quoted per building — but boards deserve real planning ranges:

Building camera assessment Free
Existing-lining inspection $650 board report
Stack restoration (epoxy coating) Quoted per building
Every backflow on the property $149 domestic · $350 fire
Typical project envelope $50,000–500,000+

Fixed-price contracts with phasing plans, insurance certificates, and lien releases — the paperwork package property management expects.

Not combinable — customers receive the greater of any membership discount or promotional offer.

Three Options — You Choose

Assessment & Board Report

Free

  • Representative stack scoping
  • Camera inspection + written findings with a recommendation
  • Phasing options and budget ranges for planning
Request Assessment + Sample Report

Existing-Lining Inspection

$650 board report

  • What is actually inside a previously lined stack
  • Camera evidence + written findings, locate & scope
  • A clear recommendation either way
Request Assessment + Sample Report

Phased Restoration Program

Quoted per building

  • Picote epoxy coating · descaling · targeted repair · replacement
  • Occupied units & operating businesses, tier by tier
  • Per-stack verification footage · construction-division depth since 1993
Request Assessment + Sample Report

Warranty

Built for Board Scrutiny

Licensed (CFC1428661) and insured with COIs issued to the association or owner; Picote-certified epoxy coating with warranty options up to 10 years; per-stack before/after footage; and a written trail your board, insurer, and property manager can follow.

Read the full Pipe Coating Warranty

The Honest-Options Promise

Written Findings Before We Quote.

Certified installers document the problem on camera, put the findings in writing, and quote three options with real prices from that report — before any work is approved. It is how 50,000+ South Florida customers have made these decisions with this team.

What Happens After You Call

  1. 1 1–2 days on site

    Assessment

    Representative stacks scoped on camera; findings documented.

  2. 2 Your meeting

    Board presentation

    Written findings, a recommendation, phasing options, and budget ranges — presented to the board or PM directly.

  3. 3 Per phase plan

    Phased execution

    Tier-by-tier restoration with resident notices, short per-stack water windows, daily re-occupancy.

  4. 4 On completion

    Closeout package

    Verification footage, warranty documents, lien releases, and the written record for the association file.

Why Building Stacks Are Coming Due

A large share of South Florida’s older buildings run on original cast iron stacks and risers — in Deerfield Beach alone, a third of housing sits in 20+-unit buildings of exactly the vintage where cast iron corrodes from the inside out. Boards are increasingly asked to document the condition of that plumbing and to plan and fund its restoration.

The specialists who used to handle this work have thinned out, and boards now compete for licensed capacity. A full-service plumbing contractor with construction-division history, Picote-certified crews, and the fire protection license to handle every backflow on the property is what that gap looks for.

And a newer problem is surfacing: buildings that lined stacks years ago are discovering gapped, wrinkled, or slope-defective liners on camera. Almost nobody inspects this work. Our existing-lining inspection — camera plus written findings with a recommendation, $650 — shows the board what is actually in the pipe.

Kyle Plumbing technician reviewing an assessment with a property manager during a building walkthrough

Frequently Asked Questions

Do residents have to move out?

No — that’s the point of trenchless restoration. Work proceeds stack by stack through existing access points, with scheduled water-off windows of hours, not days, and units re-occupied every evening.

What does the board report contain?

The camera inspection, written findings for each stack scoped, and a recommendation — restore, repair, replace, or leave alone — with phasing options and budget ranges. It is written to be read by a board and filed with the association’s records.

We’re a property manager / commercial owner, not a condo board. Same process?

Yes — and often faster, since there’s no board vote. Restaurants, retail, offices, and multifamily portfolios get the same assessment, phasing, and documentation, scheduled around business hours with COIs issued to the owner.

Our building already lined its pipes. Why inspect it?

Because gapped or slope-defective liners are common in older installs, and they fail quietly. The $650 existing-lining inspection gives you camera evidence and written findings either way: a clean report the board can file, or documented findings with a recommended fix.

Can you take over our backflow testing too?

One vendor, one visit, every backflow on the property — domestic, irrigation, and fire — tested, filed, and on an annual schedule. Testing and certification is $149 per domestic or irrigation assembly and $350 per fire assembly. As a Licensed Fire Protection Contractor (FPC26-000047) we cover the fire line assemblies most plumbers legally can’t, so you stop splitting the work between a plumber and a fire protection company.

How do boards typically fund it?

Phasing is the lever: assessments spread across tiers and budget years, aligned to the association’s planning schedule. The free assessment gives your board the ranges to plan with before any commitment.

Can you handle buildings, not just houses?

Building work is in the company’s bones — Kyle Plumbing ran construction-division projects for decades before the residential service expansion, and roughly half its history is commercial. References available for the board packet.

Here for all your plumbing needs.

Honest options, master-level techs, and up-front pricing across Broward & Palm Beach County — open 7 days · 8am–10pm.